Asphalt calculator
Driveway quotes talk in tons. Your tape measure talks in feet and inches. This page turns length × width × thickness into cubic yards and short tons so you can sanity-check a paving ticket before you wave the truck in. It is not a structural pavement design and it does not price milling, binder, or labor. Default density is a common hot-mix rule of thumb — your plant ticket wins if they print a different number.
+8% so you don't come up short
Estimate only — not a contractor bid. Confirm bag yields and local codes before you pour or order.
When to use
Overlay or patch shopping list; comparing a contractor tonnage to your measurements; figuring whether a leftover pile covers the soft spot by the garage.
When not to
Engineered road sections with specified lifts and compaction tests. Cold patch bags with weird yields — use the bag label. Parking lots with curb returns and islands as one blob — break the area into rectangles.
Assumptions
Default density ≈ 145 lb/cu ft ≈ ~2.0 short tons per cubic yard of compacted hot mix (typical DIY rule of thumb). Thickness in inches. Waste default 5–10%. No compaction factor beyond waste; no oil content math.
Worked examples
Example 1
20 × 40 ft driveway, 2 in thick, waste 8%
→ raw ≈ 4.94 yd³ → order ≈ 5.34 yd³ ≈ 10.7 tons at 2.0 t/yd³
Thin overlays need a clean, sound base — thickness math does not fix alligator cracking.
Example 2
8 × 12 ft patch, 3 in, waste 10%
→ ≈ 0.99 yd³ ordered ≈ 2.0 tons
Small patches often come as cold mix bags; compare bag yield to this volume before you force a truck minimum.
How it calculates
Volume from area and thickness, convert to yards, apply waste, then multiply by density for tons.
- Enter length, width, and thickness in inches.
- Set density if your plant quotes something other than 2.0 t/yd³.
- Dial waste; read ordered yards and tons on the ticket.
cu ft = L × W × (T ÷ 12) yd³ = cu ft ÷ 27 order yd³ = yd³ × (1 + waste%) tons ≈ order yd³ × tons_per_yd (default 2.0)
Common traps
- Plant density beats our default — ask for tons per cubic yard on the ticket.
- Loose vs compacted — truck tons are usually after compaction assumptions; do not double-add waste and compaction blindly.
- Edges and flares eat mix; measure the real paved outline, not the garage door width.
- Minimum loads — a calculator cannot erase a 3-ton plant minimum on a 1-ton patch.
Next tool
Aggregate base under asphalt → gravel calculator.
Concrete pad instead of asphalt → concrete pad calculator or slab calculator.
FAQ
Volume in cubic yards × density (often ~2 tons/yd³ for hot mix), then add waste.